Project Title |
Client |
Project Scope |
Contract Value (RM) |
Project Period |
Start Project Year |
Detailed Design, Construction, Supervision and Contract Administration of "The Flood Mitigation Immediate Action Plan Multimedia Super Corridor" (Sg. Rasau To Sg. Air Itam) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
80 Million |
6 Months |
1998 |
National Water Resource Study |
SMHB Sdn. Bhd. |
Study |
10 Billion |
4 Months |
1998 |
Detailed Design, Construction and Completion of "River Improvement Works on Sg. Klang and Sg. Ampang from Jalan Tun Razak to Jalan Memanda" |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
80 Million |
6 Months |
1998 |
Detailed Design, Construction and Completion of "Sg. Kelang Flood Mitigation Works from Jalan Klang Lama Bridge to Kota Bridge in Klang Town (Package 1,2,3)" |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
130 Million |
6 Months |
1998 |
The Detail Design, Construction, Supervision and Contract Administration of Sg. Malai Flood Mitigation Taiping, Perak |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
25 Million |
6 Months |
1998 |
Kajian Pelan Induk Tebatan Banjir Lembangan Sg. Buloh, Selangor |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
400 Million |
12 Months |
1999 |
Feasibility Study on Control of River Erosion along Batang Sadong & Flood Mitigation for Serian Town, Sarawak |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
30 Million |
12 Months |
1999 |
Masterplan Study on Flood Mitigation and River Management for Bernam River Basin |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
200 Million |
18 Months |
1999 |
Water Management Study for The Oil Palm Plantation at Sakapasir Riau, Republic of Indonesia |
TH Plantation Sdn. Bhd. |
Study |
20 Million |
6 Months |
1999 |
Project Tebatan Banjir Negeri Selangor - Pemambahbaikan Sg. Buloh |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
30 Million |
6 Months |
2000 |
Rekabentuk Terperinci Menaiktaraf Sg. Laka serta Pengkajian Semula Keseluruhan Sistem Saliran di Kawasan Perindustrian Bukit Kayu Hitam, Daerah Kubang Pasu, Kedah |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design and Site Supervision |
3 Million |
12 Months |
2000 |
Rekabentuk Terperinci Membaiki Ban Sg. Tengi di Kg. Sg. Kajang Tambahan, Tg. Karang, Selangor |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
2 Million |
2 Months |
2000 |
Kerja-Kerja Tebatan Banjir Sg. Klang dari Sg. Klang dari Sg. Rasau ke Sg. Damansara (Pakej 4) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design and Site Supervision |
100 Million |
36 Months |
2000 |
Klang River Basin Environmental Improvement and Flood Mitigation Project |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design and Site Supervision |
5 Billion |
18 Months |
2000 |
Kerja - Kerja Tebatan Banjir Sg. Klang dari Jambatan Kota Ke Sg. Rengga (Pakej 5) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design and Site Supervision |
165 Million |
36 Months |
2000 |
Consulting Services on Penyeliaan Pembinaan Projek Rancangan Tebatan Banjir MSC - Pelan Tindakan Segera Menaiktaraf Sg. Rasau, Sg. Air Hitam dan Sg. Parit Tampoi serta Kerja-Kerja yang berkaitan |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design and Site Supervision |
65 Million |
36 Months |
2000 |
Cadangan Pembangunan Bandar Enstek, Mukim Labu, Daerah Seremban, Negeri Sembulan (Main Drain B)(Close-Up) |
TH Development |
Detailed Design |
20 Million |
36 Months |
2000 |
Engineering Consultancy Services for Development of Drainage Masterplan & Detailed Design of Main Drainage for Phase 2 Development of The Flagship Zone |
Setia Haruman Sdn. Bhd. |
Drainage Master Plan, Detailed Design, Site Supervision (Main Drain) |
110 Million |
6 Months, 12 Months |
2001 |
Preliminary Design of The Sg. Klang River Improvement Works between Federal Highway Bridge and Old Klang Road Bridge (Package 6) (Close-Up) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Preliminary Design |
36 Million |
3 Months |
2001 |
Penambakan Tanah Kompleks Pengkalan Marin Kastam di Sg. Pulai, Johor (Close -Up) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
|
|
|
2002 |
Projek Hydraulik Sg. Langat to Transport Scrap Iron From Using Barges (Study)(Close-Up) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
|
2 Months |
2002 |
Projek Menaiktaraf Sg. Ampang, Daerah Hulu Langat (Phase 1) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design |
20 Million |
6 Months |
2002 |
Drainage Master Plan Study and Flood Mitigation Project for Cameron Highlands, Pahang Darul Makmur (INTERIM) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Flood Mitigation Study & Detailed Design |
12 Million |
6 Months |
2002 |
Drainage System and Outfall Structure for LNG Complex, Bintulu, Sarawak |
Petronas Berhad |
Detailed Design |
5 Million |
2 Months |
2002 |
Study and Preparation of Drainage and Stormwater Management and Strategic Master Plan for Wilayah Persekutuan |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Drainage Master Plan,Develop Drawings Master Plan |
1.5 Billion |
18 Months |
2003 |
Projek Kerja-Kerja Pengorekan di Muara Sungai Rompin, Pahang (Close:Transfer To PMC Section) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Transfer to PMC Section |
|
|
|
Preparation of National Strategic Stormwater Management Plan-MASMA (Sub from Perunding Wan Mokhtar) |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
25 Million |
6 Months |
2003 |
River Bank Protection along The Road of Complex A of Malaysian Airlines System Berhad |
Malaysian Airline System Berhad |
Detailed Design & Site Supervision |
1 Million |
6 Months |
2004 |
Stormwater Management and Road Tunnel (SMART) Project |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Project Management Specialist |
2.5 Billion |
3 Months |
2004 |
Kajian Hidraulik dan Hidrologi bagi Lembangan Sg. Gajah |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
35 Million |
3 Months |
2004 |
Rekabentuk Terperinci bagi Parit Penghubung dari Cyberjaya ke Jajaran Sg. Air Hitam (Missing Link) Cyberjaya |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design & Site Supervision |
5 Million |
3 Months |
2004 |
Consulting Services on The Development of a Rainfall - Flood Correlation Model Cum Flood Message Dessemination System for a Pilot Area in The Klang River Basin |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Rainfall Flood Model Development, Flood Mitigation Development |
1 Million |
12 Months |
2004 |
Merekabentuk, Membina dan Menyiapkan Kerja-Kerja Pembaikan Sg. Kerayong sepanjang 3.7 KM dari Jalan Loke Yew hingga Kg. Cheras Baru |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Detailed Design, Supervision |
70 Million |
6 Months, 24 Months |
2004 |
Kajian 'Effective Implementation of Integrated Water Resources Management in Malaysia (IWRM)' |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
|
12 Months |
2005 |
Consulting Services on The Flood Mitigation Study for Sg. Rasau at Lot 336 |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
|
3 Months |
2005 |
The Preliminary Design of The Perimeter Bunds for The "Rancangan Kawasan Khas Berjuntai Bestari", Daerah Kuala Selangor |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
|
6 Months |
2005 |
Penyediaan Garis Panduan bagi "Flood Loss Preventation For Basement Car Park" |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
|
2 Months |
2006 |
Rekabentuk Terperinci bagi Lembangan Sg. Gajah, Cyberjaya |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study & Detailed Design |
35 Million |
6 Months |
2006 |
Consulting Services on Paya Indah Wetlands Sustainalble Water Resources Management Plan Study & Detailed Design of Relevant Facilities |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study & Detailed Design |
10 Million |
6 Months |
2006 |
Kerja-Kerja Pengorekan Muara Sg. Johor di Daerah Kota Tinggi, Johor untuk Membaiki Kerosakkan Akibat Banjir |
Jabatan Pengairan dan Saliran (JPS) Johor |
Detailed Design, Supervision |
65 Million |
1)3 Months, 18 Months |
2007 |
Consulting Services Input on Culvert and Bridge Crossing Design for The Double Tracking Railway Project from Ipoh, Perak To Sg. Petani, Kedah |
MMC-Gamuda JV |
Study |
2.4 Million |
12 Months |
2007 |
Proposed Sg. Golok (KESBAN) Flood Protection Scheme |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study & Detailed Design |
8 Million |
19 Months |
2008 |
Kajian Pelan Induk untuk Lembangan Sg. Johor, Johor |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study |
3.2 Million |
12 Months |
2008 |
Developing The Atmospheric Model Based Rainfall and Flood Forecasting (AMRFF) System for Pahang, Kelantan, & Johor River Basin |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Study & Detailed Design |
5 Million |
24 Months |
2008 |
Best Management Practices (BMP) in Awareness Raising and Capacity Building Towards The Effective Implementation of Integrated Water Resources Management in Malaysia |
Jabatan Pengairan dan Saliran (JPS) Malaysia |
Facilitating DID States for Implement Nine IWRM-BMP's Projects |
|
36 Months |
2009 |
Kajian Komprehensif bagi Mewujudkan Jelapang Padi Negara di Daerah Rompin dan Daerah Pekan, Pahang |
BPSB |
Feasibility Study |
|
6 Months |
2010 |